Weekly Log Feb 28- Mar 6

After visiting the manufacturing lab Friday, there was seen to be no further progress on the project. The adapters needed for our motor...

Weekly Log Feb 21-27

After receiving the confusing email from Matthew, we emailed the manufacturing student Ana to try and understand what is going on with...

Weekly Log Feb 14-20

Matthew was able to cut out some more pieces for the chassis Tuesday the 13th. With this process, we were able to receive a pair of...

Weekly Log Feb 7-13

We met with Matthew on Monday to review his progress on the robot. He is still cutting all of the pieces, and it’s honestly taking longer...

Weekly Log Jan 31- Feb 6

We have been in contact with Matthew about receiving the design files and have so far gotten half of them. The graduate student is still...

Weekly Log Jan 24-30

Our corrected parts have come in. We have also received our flat free swivel caster wheels. The only part we are currently waiting on is...

Weekly Log Jan 17-23

We are still working on correcting our parts and re-ordering the correct parts. We hope to correct these errors and move on to the...

Weekly Log Jan 8-16

To start the new semester, we had to go pick up our ordered parts. Over the Christmas break, we had to deal with problems and corrections...

Weekly Log Nov 4- 10

Cassidy and I received the CEIT undergraduate award for $2000 from AGCO. We have meet with Dr. Rios have have decided to have front wheel...

Weekly Log Oct 28- Nov 3

During the week, Cassidy was able to get the 3D part printed for the test robot. With this part, we will be able to rewire the test robot...

Weekly Log Oct 21- Oct 27

Once again, the meeting with Matthew was cancelled because he could not make it. We were able to speak on the phone and this will work in...

Weekly Log Oct 14- Oct 20

The meeting with Matthew was canceled for this week. We will generally be meeting every Friday at 1:45 at the IT Building. We still need...

Weekly Log Oct 7- Oct 13

Only Cassidy was able to meet with Matthew Carter because Cassandra had previous engagements. During this meeting, she set up a time to...

Weekly Log Sept 29- Oct 6

We have been in contact with Matthew Carter, the manufacturing graduate student, about design specificities of the robot. We will meeting...

Weekly Log Sept 22 - 28

We will now only be using the Pixy Camera as a way to follow the robot’s owner. We have decided against using the RFID card/ reader. This...

Weekly Log Sept 8 - 21

We have decided on creating the Travel Buddy, an autonomous robotic cart that follows the owner. As a group, we have been trying to...

Georgia Southern University

1332 Southern Dr.

Statesboro, GA 30460

© 2017. Proudly created with Wix.com

  • Facebook - Black Circle
  • Twitter - Black Circle
  • Google+ - Black Circle
  • LinkedIn - Black Circle
bottom of page